In large construction and fabrication spaces, overhead/bridge cranes do the heavy lifting—literally. This field-tested breakdown takes you behind the scenes of a mega-project crane install. We’ll cover rails and runway alignment—with the same checklists pro installers use.

Overhead Crane, Defined

An overhead crane rides on parallel runways anchored to a building frame, carrying a trolley-mounted hoist for precise, vertical picks. The result is smooth X-Y-Z motion: and lift via the hoist.

You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.

Why they matter:

Controlled moves for large, expensive equipment.

Huge efficiency gains.

Repeatable, precise positioning that reduces damage.

Support for pipelines, structural steel, and big machinery installs.

Scope at a Glance

Runways & rails: continuous beams and rail caps.

End trucks: wheel assemblies that ride the rail.

Bridge girder(s): cambered and pre-wired.

Trolley & hoist: cross-travel carriage with lifting unit.

Electrics & controls: power supply, festoon or conductor bars.

Stops, bumpers & safety: end stops, buffers, travel limits.

Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.

Make-Ready & Surveys

A clean install is mostly planning. Key steps:

Drawings & submittals: Freeze the GA and verify reactions with the structural team.

Permits/JSAs: Job Safety Analysis (JSA) for each lift step.

Runway verification: Check baseplates, grout pads, and anchor torque.

Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.

Staging & laydown: Mark crane components with ID tags.

People & roles: Brief everyone on radio calls and stop-work authority.

Tiny survey errors balloon into hours of rework. Spend time here.

Rails & Runways

Runway alignment is the foundation. Targets and checks:

Straightness & elevation: shim packs under clips to meet tolerance.

Gauge (span) & squareness: Use feeler gauges on splice bars, torque rail clips.

End stops & buffers: Install and torque per spec.

Conductor system: Mount conductor bars or festoon track parallel to the rail.

Log final numbers on the ITP sheet. Correct now or pay later in wheel wear and motor overloads.

Lifting the Bridge

Rigging plan: Softeners protect painted flanges. Taglines for swing control.

Sequence:

Install end trucks at staging height to simplify bridge pick.

Rig the bridge girder(s) and make the main lift.

Use drift pins to align flange holes; torque to spec.

Verify camber and bridge square.

Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): confirm limit switch wiring. Lock out after test.

The Heart of the Lift

Trolley installation: Hoist/trolley arrives pre-assembled or as modules.

Hoist reeving: Lubricate wire rope; verify dead-end terminations.

Limits & load devices: Check overload/SLI and emergency stop.

Cross-travel adjustment: Verify end stops and bumpers.

Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

A smooth trolley with a quiet hoist is a sign of good alignment. Don’t mask issues with higher VFD ramps.

Power with Discipline

Power supply: Conductor bars with collectors or a festoon system.

Drive setup: Program VFDs for soft starts, decel ramps, and brake timing.

Interlocks & safety: Zone limits near doors or mezzanines.

Cable management: Keep loops short, add drip loops where needed.

Future you will too. If it isn’t documented, it didn’t happen—put it in the databook.

QA/QC & Documentation

Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.

Torque logs: Record wrench serials and values.

Level & gauge reports: Note any corrective shims.

Motor rotation & phasing: Document bump tests.

Functional tests: Jog commands, inching speeds, limits, overloads, pendant/remote range.

A tidy databook speeds client acceptance.

Ready for Work

Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).

Dynamic load test: Check sway, braking distances, and VFD fault logs.

Operational checks: Emergency stop shuts down all motions.

Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.

When the logbook is clean, the crane is officially in service.

Everyday Heavy Lifting

Construction & steel erection: handling long members safely.

Oil & gas & power: generator and turbine assembly.

Steel mills & foundries: large part transfer.

Warehousing & logistics: bulk material moves with minimal floor traffic.

Once teams learn the motions, cycle times drop and safety improves.

Controls that Matter

Rigging discipline: dedicated signaler and stop-work authority.

Lockout/Tagout: test before touch every time.

Fall protection & edges: scissor lifts and manlifts inspected.

Runway integrity: regular runway inspection plan.

Duty class selection: match crane class to cycles and loads.

A perfect lift is the one nobody notices because nothing went wrong.

If It Doesn’t Run Smooth

Crab angle/drift: re-check runway gauge and wheel alignment.

Hot gearboxes: adjust brake air gap and reduce VFD decel.

Rope drum spooling: check fleet angle and sheave alignment.

Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.

Wheel wear & rail pitting: add rail sweeps and check clip torque.

A 10-minute weekly check saves days of downtime later.

Fast Facts

Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.

Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.

How long does install take? Scope, bay readiness, and tonnage rule the schedule.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Who Gets the Most Value

Students and pros alike get a general construction company front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.

Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?

Get the toolkit now so your next crane goes in cleaner, faster, and right the first time. Bookmark this guide and share it with your crew.

...